Completed
Last Updated: 23 Mar 2021 09:34 by ADMIN
Release 2021.R1.SP.next
Stig
Created on: 01 Mar 2021 10:28
Category: Scheduler
Type: Bug Report
1
Events longer than 24h cannot be dragged over a specific timeslot in Scheduler timeline view

Bug report

Regression introduced in R3 2020 SP2. Possibly related to #6034

Reproduction of the problem

Dojo example.

  1. Attempt to drag first event to a slot before the one it starts in.

Current behavior

The event cannot be dragged/dropped over the desired slot. It is automatically placed over the first slot of the day it starts in.

Expected/desired behavior

The event can be dropped over the desired time slot.

Environment

  • Kendo UI version: 2021.1.224
  • jQuery version: x.y
  • Browser: [all]
0 comments