Unplanned
Last Updated: 17 Jan 2020 09:14 by ADMIN
Naveen
Created on: 17 Jan 2020 09:13
Category: Spreadsheet
Type: Bug Report
2
Date Validation Issue if range parameters are referenced from another cell

There is an issue with the Date type fields validation in the Spreadsheet. 

Here are the reproduction steps:

1. Open https://demos.telerik.com/kendo-ui/spreadsheet/index

2. Import attached xlsx file.

3. There are two date cells (B1 & B2), B2 has a data validation (Date between B1 to ToDay)

4. Try to edit the date using the calendar icon from B2. An empty calendar appears

Note: If I change data validation (remove reference of B1 and put hardcoded date) as below then it works.


Attached Files:
0 comments