Currently when scheduled tests don’t run properly (which none of them do for us at the moment but that is a different story), I have to get the job ID and delete the job using Fiddler. I’ve tried deleting the schedule in the Results section of Test Studio and also tried deleting the files from the C:\Windows\SysWOW64\config\systemprofile\AppData\... folder as well to no avail. Reloading the test results on the Results tab would continually repopulate the timeline with the scheduled list. Once I deleted the jobs sing Fiddler it was all good but needs to be a way to do this is the application. It would also be nice to be able to edit previously scheduled jobs if something changes rather than having to delete and recreate them.