I have encountered this problem numerous times but I will list one of them. When printing a weekly schedule in the format of a calendar, the days of the week print top to bottom when the desired layout should be L to R. We have resorted to various hacks to get this to work, but this is another feature of ***(which we are converting from) that is not supported in Telerik Reporting. It would be nice if there was an OPTION to flow L to R as opposed to Top to Bottom.