Unplanned
Last Updated: 05 May 2023 14:20 by Russ
Russ
Created on: 05 May 2023 14:20
Category: Telerik Document Processing
Type: Bug Report
0
Spreadsheet: When a value in the format "7000-5" is pasted or written in Spreadsheet it is interpreted as date

The problem can be found in two places:

1. When the value "7400-5" is pasted, the result in Spreadsheet is 2008956, which is the underlying raw date value.

2. When 7400-5 is written in the control directly, the result is 5/1/7400, which is 2008956 with a date format on it.

0 comments