Completed
Last Updated: 22 Feb 2018 12:13 by ADMIN
ADMIN
Created by: Telerik Admin
Comments: 12
Category: Calendar
Type: Feature Request
31
Available in the 2017 R1 Release (2017.1.117).
More information you can find in following help article: http://docs.telerik.com/devtools/wpf/controls/radcalendar/features/globalization
Unplanned
Last Updated: 03 Jan 2017 20:49 by ADMIN
ADMIN
Created by: Kalin
Comments: 7
Category: Calendar
Type: Feature Request
11
You can check the following blog post showing how you can easy add your custom SelectedDates dependency property: http://www.telerik.com/blogs/using-the-multiple-selection-of-the-radcalendar-control-for-silverlight-and-wpf-with-mvvm .
Unplanned
Last Updated: 03 Jan 2017 20:48 by ADMIN
ADMIN
Created by: Telerik Admin
Comments: 0
Category: Calendar
Type: Feature Request
6
When DateSelectionMode is set to Month and SelectionMode is set to Multiple or Extended selecting multiple months should be available.
Declined
Last Updated: 18 Nov 2014 13:02 by ADMIN
When ran on 1366x768 resolution and the DPI is set to higher value than the default one, in some cases the control is not rendered correctly.
Unplanned
Last Updated: 03 Aug 2016 10:23 by ADMIN
Unplanned
Last Updated: 01 Sep 2016 11:52 by ADMIN
RadCalendar should have property which switches between single raise of the SelectionChanged event when multiple items are selected and multiple raises (on each element hover) when multiple items are selected. When the property is in single raise mode, the event should be raised only once on MouseLeftButtonUp. In this case the SelectedItems collection should be also updated at once.
Completed
Last Updated: 23 Nov 2015 15:06 by ADMIN
When clicking fast through days inside RadCalendar the SelectionState does not disappear when another day is selected.The issue is reproduced only in the selection mode.

Available in LIB version 2015.3.1123, it will also be available in the 2016 Q1 release.
Completed
Last Updated: 18 Apr 2016 13:19 by ADMIN
When DayTemplateSelector that sets template with IsEnabled = False is set at runtime, no calendar buttons can be selected - even these that does have IsEnabled = True.

Available in LIB version 2016.1.418, it will be also available in the 2016 R2 release.
Unplanned
Last Updated: 09 Jul 2020 11:16 by ADMIN
Canceling the changing of the value bound to the SelectedDate causes the new clicked date to by highlighted incorrectly. The new selected date should not be highlighted since the bound value has not been changed to that value. The issue can be observed in RadCalendar, RadDatePicker and RadDateTimePicker controls.
Unplanned
Last Updated: 25 Nov 2020 08:21 by ADMIN
Created by: Dinko
Comments: 0
Category: Calendar
Type: Feature Request
2

Currently, the RadCalendar control support month, year, decade, and century view. The week view could look similar to the image below:

Unplanned
Last Updated: 03 Aug 2016 10:23 by ADMIN
Completed
Last Updated: 27 Sep 2019 14:15 by ADMIN
Release LIB 2019.3.930 (09/30/2019)
Allow control over the next and previous view buttons visibility. See the attached image.
Completed
Last Updated: 06 Mar 2015 15:20 by ADMIN
Available in LIB version 2014.3.1319 as it will be also available in the 2015 Q1.
Completed
Last Updated: 22 Mar 2019 09:00 by ADMIN
Release 2019.1.325 (03/25/2019)
Created by: Darshan
Comments: 1
Category: Calendar
Type: Bug Report
0

Hello,

This is an issue in RadCalendar when we use Multiple month view. This problem can be reproduced in the WPF demo examples.

RadCalendar -> Selection range and Constraints

1. Set the radcalendar columns = 3.

 

 

2. Select a date in the month of May. For example select May 8th.

 

3. Click on the next button in navigation to move to next set of months. It should ideally have shown June, July and August after March, April and May. But it skips 2 months and goes directly to August, September and October.

 

 

4. If int he same way you select a date in April and navigate to next three months. It skips one month(June) and shows July, August and September

 

This happens if we have set the columns value to greater than 1. I guess in trying to set the 3 months to show in the calendar the selected date/month depending on if its the 2nd or the 3rd month in the sequence shown causes the calendar to skip 1 or 2 months respectively.

This can be replicated on one your demo projects. Let me know if you need a project from me.

I couldnt find a bug report or a question in the telerik forum on this topic. If its not reported before this should be a simple fix for you guys. 

 

 

Declined
Last Updated: 27 Jun 2017 13:28 by ADMIN
Unplanned
Last Updated: 06 Mar 2024 15:38 by ADMIN
Currently, the maximum that is displayed in the calendar is 1/1/3000  and the minimum is 1/1/1000.  However, you can set a value that is bigger or smaller in the SelectedDate property. Introduce an API that allows changing those dates.
Unplanned
Last Updated: 19 Apr 2018 12:47 by ADMIN
Introduce a mechanism for enabling/disabling the animation executed when changing the views - month, year, etc. Currently, there is an animation executed by default which cannot be turned off.