Unplanned
Last Updated: 17 Nov 2021 08:48 by ADMIN
Created by: Ivan
Comments: 0
Category: Gantt
Type: Feature Request
1
Currently, you can initiate task editing by double-clicking on an item. I would like to have different options (like buttons) to initiate editing. 
Completed
Last Updated: 04 Feb 2022 13:22 by ADMIN
Release 3.1.0
Created by: Ivan
Comments: 0
Category: Gantt
Type: Feature Request
1
I would like to use Popup editing, and Inline editing as I am able to do so in the TreeList component. 
Completed
Last Updated: 31 Mar 2022 09:10 by ADMIN
Release 3.2.0
Created by: Ivan
Comments: 0
Category: Gantt
Type: Feature Request
1
Controlling the position of the slider between the TreeList and TimeLine panel
The position of the separator is determined by something incomprehensible.
The user only has to guess that the only way to get to the command buttons is by sliding the slider to the right.
Solution:
Implement the "SliderWidth" property in relative units for the component's slider position.
Completed
Last Updated: 01 Feb 2022 09:10 by ADMIN
Created by: Ivan
Comments: 0
Category: Gantt
Type: Feature Request
2

It is very strange that while the Gantt component is similar to the gorgeous Grid component, support for row and header templates has not been released.
We await implementation
<GanttColumn>

  <HeaderTemplate Context = @ myContext>

  </HeaderTemplate>

  <Template Context = @ myContext>

  </Template>

</GanttColumn>

 

**Admin Edit**

Will be released in 3.1.0.

**Admin Edit**

 

Completed
Last Updated: 06 Jun 2022 06:16 by ADMIN
Release 3.1.0
Created by: Ivan
Comments: 5
Category: Gantt
Type: Feature Request
3

By default, all nested tasks are displayed expanded.
The state of the root task is always the most important, so it makes more sense to display tasks minimized by default.
The user can always expand the required task for details.
The solution is to support the "IsExpanded" property for the task model.
When a property changes, the task changes its state.
For the component, also add the "ExpandAll" and "CollapseAll" methods that affect all tasks in the list.


Unplanned
Last Updated: 17 Nov 2021 08:51 by ADMIN
Created by: Ivan
Comments: 1
Category: Gantt
Type: Feature Request
2

The current implementation of the double-click task edit feature is not an intuitive user interface action.
Also, there is absolutely no need to automatically edit the properties of the task model when you click on GanttColumns.
Give the developer independent control over the behavior of the edit event.
Necessary solutions:
1. Implement support for the "IsEnabled" task model property that disables editing the property for the GanttColumn and double-clicking on the Timeline panel
2. Implement support for the "Edit" command for the GanttCommandButton

Completed
Last Updated: 07 Feb 2022 15:53 by ADMIN
Release 3.1.0
Created by: Ivan
Comments: 0
Category: Gantt
Type: Feature Request
2
I would like to cancel the edit of certain tasks based on a condition. 
Completed
Last Updated: 03 Feb 2022 07:06 by ADMIN
Release 3.1.0
Created by: Benjamin
Comments: 3
Category: Gantt
Type: Feature Request
2

When I describe a EditorTemplate on a GanttColumn, I expect it to be shown on entering the edit-mode:

<GanttColumn Field="@nameof(ActivityContainer.TaskName)" Title="@_["_name"]" Expandable="true" Resizable="true" >
<EditorTemplate>
<strong>I expect this to see</strong>
</EditorTemplate>
</GanttColumn>

Expected: Just the string "I expect this to see"

What I actually get:

The default edit box (feels like the EditorTemplate doesn't apply at all?)

Docs (https://docs.telerik.com/blazor-ui/api/Telerik.Blazor.Components.GanttColumn#collapsible-Telerik_Blazor_Components_GanttColumn_EditorTemplate) say, that the GanttColumn has a EditorTempalte.

---

Side effect:

<GanttColumn Field="@nameof(ActivityContainer.TaskName)" Title="@_["_name"]" Expandable="true" Resizable="true" >
<EditorTemplate>
<strong>@((context as ActivityContainer)?.TaskName)I expect this to see</strong>
</EditorTemplate>
</GanttColumn>

error CS0103: The name 'context' does not exist in the current context

 

Context should be there.

Unplanned
Last Updated: 22 Oct 2021 05:47 by ADMIN
Created by: Benjamin
Comments: 0
Category: Gantt
Type: Feature Request
6
I would like to use the Quarter View for the Gantt
Completed
Last Updated: 18 Aug 2022 10:16 by ADMIN
Release 3.6.0 (14 Sep 2022) (R3 2022)
Created by: Benjamin
Comments: 4
Category: Gantt
Type: Feature Request
4
I would like to be able to use a Refresh method exposed on the component reference. 
Unplanned
Last Updated: 12 Jul 2022 21:31 by Debra
Created by: Uresys
Comments: 2
Category: Gantt
Type: Feature Request
4
I'd like to have an OnTaskDoubleClick event for the Gantt tasks, so a I can handle it to include some custom logic instead of displaying a popup to edit the task.
Completed
Last Updated: 01 Oct 2021 10:08 by ADMIN
Release 2.28.0
Created by: Uresys
Comments: 0
Category: Gantt
Type: Feature Request
2
I'd like to have access to the GanttTaskCommandEventArgs, so can easily handle custom command actions.
Unplanned
Last Updated: 04 Oct 2021 07:40 by ADMIN
Created by: SUP
Comments: 1
Category: Gantt
Type: Feature Request
4
ShowWorkHours in the Gantt timeline
Need More Info
Last Updated: 22 Oct 2021 05:47 by ADMIN
Created by: Jerdobi
Comments: 2
Category: Gantt
Type: Feature Request
2

I want to be able to create custom views for the Gantt Timeline, for example - minutes view.

-------------------------

ADMIN EDIT

-------------------------

The post is marked with "Need more info" label, so we can gather feedback from the community on how this feature is expected to be exposed for configuration and what the desired behavior is. An important point to consider regarding this enhancement is that, depending on its implementation, it might override the built-in Gantt Timeline functionalities, so it will be up to the application logic to handle the tasks features (for example editing, dependencies etc). Please share your comments and ideas.

Unplanned
Last Updated: 21 Sep 2021 15:56 by ADMIN
Created by: Enrico
Comments: 0
Category: Gantt
Type: Feature Request
3
Expose an OnItemRender event, which is raised for each Gantt Timeline task. The args should allow setting a Class, that will be applied at the topmost element of the item itself.
Unplanned
Last Updated: 24 Aug 2021 16:40 by ADMIN

Is it possible to change the format of the displayed date at the top of the chart? (See the screenshot) Also, I would like to know what to do if possible.

I would appreciate it if you could hold a reply.

Completed
Last Updated: 09 Sep 2021 12:35 by ADMIN
Release 2.27.0
Created by: Benjamin
Comments: 0
Category: Gantt
Type: Feature Request
3

The new Gantt feature turned out really great. It would be nice if the relationships such as predecessor and successor were added, as well as different relationship types (e.g. start-end or start-start) with corresponding offsets.

Likewise, the representation of the critical path and a baseline.

Completed
Last Updated: 28 Jun 2022 16:18 by ADMIN
Release 3.1.0
Created by: Benjamin
Comments: 8
Category: Gantt
Type: Feature Request
4

Zooming levels would be great

GanttCommandButton Command="ZoomIn|ZoomOut|ZoomToFit"...>

 

The current Views (Day/Week/Month/Year) are nice, but custom zooming is needed sometimes.

Unplanned
Last Updated: 16 Aug 2021 14:09 by ADMIN

in the demo, the percentage display can be over 100%.
As soon as it is over 100% there, the following error is displayed:

(this also happens because it is always incremented by 1, which then always corresponds to an additional 100%.)

 

 

==========

ADMIN EDIT

==========

In the meantime, a possible workaround could be to use the built-in validation and set values 0 to 1 for the Range attribute of the Percent Complete field. The attached example demonstrates how to achieve that.

 

1 2