When the end date of a task is edited in the End Time column in Gantt in the save event handler e.task.end returns the new end date value. With versions, before 2020 R3, the old end task value has been returned.
The behavior is inconsistent with editing a task through dragging or by double-clicking on a task as in such case the previous value of the end task will be returned
With the current version, the new end date is returned.
The returned e.task.end should be consistent with the other ways of changing the date e.g. dragging or double-clicking on the task.
With e.preventDefault in the save event of the Gantt, the TreeList becomes unresponsive when blurring a task field.
The parent task collapses and becomes unresponsive
The parent task should not collapse and become unresponsive
Hi Team,
I would like to request an easy, built-in way to format the dateTimePickers with the popup editor for the Kendo UI Gantt. Currently, the validation will not allow for the editor to be set to a specific format without creating a dedicated editable.template.
Thank you!
The menu that determines where to add new task incorrectly appears after creating a new task and editing an existing one.
The Add Child/Above/Below menu appears unexpectedly.
The menu should not appear and a new task should be added at the bottom of the list.
Currently Task Template and Toolbar Template doesn't integrate with AngularJS. E.g. it is impossible to use {{ $ctrl.mymember }} or <my-angular-component></my-angular-component> for the task template in gantt.
Hi,
Want the ability to filter on the resource column.
Dojo example.
https://dojo.telerik.com/iZixAfiV
Currently there is only template for Gantt I need to be able to control the tooltip behaviour. showOn:"mouseenter", "click" , "focus" autoHide: true, false position: "bottom", "top", "left", "right", "center"
When tasks are reordered in Gantt duplicated requests are sent for updating.
For example, in case two tasks on the same level are changing their places, four requests are sent, two by two the requests are the same.
In case a task is moved on a different level multiple requests are sent, as all are duplicated.
There should be no duplicated requests when reordering tasks in Gantt
This is a regression introduced with R3 2020 (2020.3.915)
When the validation message appears that the Start Date should be before the End Date, picking a proper End Date does not automatically remove the validation message in the Gantt.
Workaround: call the validate method in the change event of the End DatePicker.
https://dojo.telerik.com/@martin.tabakov@progress.com/IQiRukIN/11
The validation message remains and the user must again focus and blur the Start Date picker for the message to disappear.
The validation should be removed automatically after picking a EndDate that is after the StartDate.
I am working with AngularJs and in the normal Grid its possible to add ng-click Events to Columns with the Attribute Property for the ColumnDefintion, that would be great if this works too for the Gantt Chart. Because I can add a ng-click to Gantt Column and with the event I can get the current row Id and open my own custom Modal to edit the Values.
Add possibility to automatically center the Gantt timeline to a given date onload.
When there are tasks with duration only in non-working days and showWorkDays is enabled Gantt displays unnecessary arrows for those tasks.
A similar issue appears also in case there are tasks with resources. In case the task's duration is only on non-working days the text of the resource still appears although showWorkDays is enabled.
When showWorkDays is enabled, the tasks with duration only in non-working days are not visible. However, unnecessary arrows for dependency tasks and text of the resources are displayed.
When showing only working days is enabled there should be no arrows for the tasks with dependencies and no resources text on non-working days
I would like to be able to toggle the planned vs actual view on Gantt outside of the Gantt toolbar. This can be achieved using private methods as in the example below and the Dojo linked here:
```
function changeValue(){
var gantt = $('#gantt').data('kendoGantt')
var timeline = gantt.timeline;
var showPlanned = $('#gantt input.k-gantt-planned-switch').data('kendoSwitch').check()
$('#gantt input.k-gantt-planned-switch').data('kendoSwitch').check(!showPlanned)
gantt.wrapper.toggleClass("k-gantt-planned");
timeline._setPlanned(!timeline.options.showPlannedTasks);
timeline._render(gantt.dataSource.taskTree());
timeline._renderDependencies(gantt.dependencies.view());
}
```
However, having a public method for showing the planned tasks (for example showPlannedTasks(true) ) would be very helpful.
If you select a custom view in the Gantt and shrink the window so that a DropDownList would appear, the custom view does not appear as selected in the DropDownList.
Quaterly custom view is not displayed as the selected value of the DropDownList
Quaterly custom view should be displayed as the selected value of the DropDownList
We have many tasks, and rendering in gantt so slowly. If use Pager with datasource, gantt show items on level 2 and above. Please, add virtualization + virtual scroll in gantt control
When planned tasks are displayed and rowHeight is set to the Gantt, the dependency lines are displayed incorrectly
Dependency lines are misplaced
The dependency lines should be rendered on the correct position
Set the padding-top to '.k-task-wrap' elements
Dojo