Completed
Last Updated: 10 Oct 2019 14:42 by ADMIN
Release 2019.R3.SP.next
Created by: Chinmaya
Comments: 0
Category: Scheduler
Type: Bug Report
0

Bug report

Scheduler cannot be scrolled in iOS 13 with Chrome

Reproduction of the problem

The issue can be reproduces in the Demos with the Chrome browser.

Current behavior

Scheduler content area cannot be scrolled.

Expected/desired behavior

Scheduler content area should be scrollable.

Environment

  • Kendo UI version: 2019.3.917
  • Browser: [all]
Completed
Last Updated: 26 Jul 2019 14:17 by ADMIN
The user should be able to select multiple events at the same time by pressing the control key. At the moment this can not be done.
The following example shows the issue: http://dojo.telerik.com/udItE -> It is not possible to select events from Meeting Room 101 and Meeting Room 201 at the same time.

This feature would make it possible to swap events from different groups. For example, swap the meeting rooms of two events.
Completed
Last Updated: 26 Jul 2019 14:08 by ADMIN
Created by: Imported User
Comments: 1
Category: Scheduler
Type: Feature Request
1
Please add the feature to open an event from the weekview.
Completed
Last Updated: 03 Jun 2019 13:50 by ADMIN
Release 2019.R2.SP.Next
Created by: Konstantin
Comments: 0
Category: Scheduler
Type: Bug Report
0

Bug report

The create button should be available only when editable is enabled.

Reproduction of the problem

https://dojo.telerik.com/itUCAdeK

Workaround

https://dojo.telerik.com/IMAWIZeV

Completed
Last Updated: 26 Jan 2018 16:28 by ADMIN
Created by: Hendrik
Comments: 1
Category: Scheduler
Type: Feature Request
12
The multi drag and drop feature that existed in the Silverlight ScheduleView has disappeared in Kendo UI. 

Is it possible to add support of dragging and dropping multiple events at the same time, allowing to edit the time and date of multiple events with the same time difference (e.g. +2 hours and - 1 day)?
Completed
Last Updated: 19 Sep 2016 05:29 by ADMIN
Created by: josew josew
Comments: 42
Category: Scheduler
Type: Feature Request
234
Scheduler:

Group appointments by date. Now only by resource.
DayView: select the visible date interval: continous or discontinous.

( Other company mvc scheduler do it and it's functional ) 

Thanks
Completed
Last Updated: 12 May 2016 09:53 by ADMIN
Created by: Bjorn
Comments: 1
Category: Scheduler
Type: Feature Request
4
Autoscroll when dragging an object from outside the scheduler (e.a. from a grid) is already available and works fine. It would be really nice to have this vert same functionality also available while dragging an event that's already in the scheduler...
1 2 3 4