Unplanned
Last Updated: 24 Mar 2020 10:12 by ADMIN

Currently, the Scheduler has the navigate event that is triggered when the user changes the selected date or view of the component. This event is triggered before the new view is loaded. 

It will be very useful if there is an event, similar to navigate, which is triggered when the new view is loaded, not before.    

* The Scheduler's view instance has an "activate" event that is not publicly exposed. This event could be exposed as a possible implementation of the current FR. 

Unplanned
Last Updated: 08 Jan 2020 13:59 by ADMIN
Created by: Kenneth
Comments: 1
Category: Scheduler
Type: Bug Report
0

Hi, we're using scheduler and we have the selectable set to true so users can drag and select timeslots to create.

The issue we're having is related to the autoscrolling when the user attempts to create a selection that is longer than the display window and attempts to drag past the display window but the scheduler would not auto scroll to expand the selection.

However, if we were to expand an existing event, the handler would be able to expand past the display window and scheduler would auto scroll. We were wondering if the event creation could have the same behavior.

 

Thanks,

Kenneth 

Unplanned
Last Updated: 29 Nov 2019 09:37 by ADMIN

In some cases, especially when grouping is involved, the day/week/workWeek views may end up with too many events in a single slot. If the total width of those events could not fit within the slot size, those events will overflow and cover some of their sibling events. To avoid such a result, events rendering in a scrollable container should be considered. This way each event will have a minimum width even if it has too many siblings in the same slot.

Here is a Dojo sample demonstrating the case: https://dojo.telerik.com/UnUnUTAW/6

Unplanned
Last Updated: 27 Nov 2019 12:52 by ADMIN

Scenario:

A user deletes an occurence because a few people are ill. Five minutes later the superior enters the office and says the meeting happens anyway. Or the user deletes a wrong occurence.

Resetting the recurrence might not be an option for long running meetings. Like weekly Scrum, project jour fix, ... where the other exceptions should persist. Currently the user has to create a new, separate event.

The exceptions could be rendered as multiselect or list in a separate window which opens after a button click. That way the recurrence editor would not look messy with lots of exceptions.

Completed
Last Updated: 13 Jan 2020 09:16 by ADMIN
Release R1 2020
Created by: Narendra
Comments: 3
Category: Scheduler
Type: Bug Report
0

hello,

 

we recently upgraded the kendo from 2018 r1 to latest release. looks like there is a bug in the scheduler. With the server filtering and server operation true, I am unable to add Event(before upgrade it's fine).

check the dojo https://dojo.telerik.com/EhaXemiz 

 

can you please look into it.

 

Thanks,

Narendra

Unplanned
Last Updated: 21 Jun 2021 12:28 by ADMIN
For the Kendo Scheduler Recurrence Rule editor, it would be nice to have the possibility to select multiple options for the recurrence of monthly events. For example instead of only being able to select only the first Monday of the Month for a recurring event to be able to select every first and third Monday of the Month for a recurring event.
Unplanned
Last Updated: 08 Nov 2019 08:38 by ADMIN
Currently, the method that selects the events after DataSource.read() depends on the events' uids. However, upon data binding, new event elements are created, with different uids. Therefore the corresponding event is not selected.
Completed
Last Updated: 10 Oct 2019 14:42 by ADMIN
Release 2019.R3.SP.next
Created by: Chinmaya
Comments: 0
Category: Scheduler
Type: Bug Report
0

Bug report

Scheduler cannot be scrolled in iOS 13 with Chrome

Reproduction of the problem

The issue can be reproduces in the Demos with the Chrome browser.

Current behavior

Scheduler content area cannot be scrolled.

Expected/desired behavior

Scheduler content area should be scrollable.

Environment

  • Kendo UI version: 2019.3.917
  • Browser: [all]
Unplanned
Last Updated: 01 Oct 2019 07:29 by ADMIN
Created by: Hitendra
Comments: 1
Category: Scheduler
Type: Feature Request
3

Hi Team,

 

It would be nice to have a feature of Collapsible / Expandable grouping function like tree view in Kendo Scheduler Timeline view. We have multiple head groups with 100 sub groups which we are not currently able to Expand / Collapse.

 

Sample Expand / Collpase feature like https://demos.telerik.com/kendo-ui/treeview/checkboxes

File attached for reference.

 

Thank you.

 

 

 

Unplanned
Last Updated: 11 Dec 2020 10:26 by ADMIN

Bug report

In Scheduler event, if the eventTemplate has a table, the add event is triggered when editing an existing task, resulting that both popups open and close instantly.

Reproduction of the problem

Open this dojo example. Choose an event and click the span containing the text "I have some icons here".

Current behavior

The add event popup shows together with the edit event popup.

Expected/desired behavior

Only the edit event popup should be displayed.

Environment

  • Kendo UI version: 2019.3.917
  • Browser: [all]
Unplanned
Last Updated: 12 Aug 2019 14:14 by ADMIN

Bug report

Reproduction of the problem

Reproducible in the Events demo.

  1. In the AllDay slot click and drag the mouse from Monday to Wednesday.
  2. The change event fires 3 times (expected).
  3. Click on Wednesday to select only that slot.
  4. The change event does not fire.

Also reproducible when selecting the slots from right to left (Wed to Mon) and then selecting the last slot (Mon).

The behavior is identical when selecting slots in a specific day, e.g. selecting and dragging from 8:00 to 10:00 and then selecting the last slot (9:30-10:00).

Current behavior

The change event does not fire.

Expected/desired behavior

The change event fires.

Environment

  • Kendo UI version: 2019.2.619
  • jQuery version: x.y
  • Browser: [all ]
Declined
Last Updated: 19 Jan 2023 13:11 by ADMIN

Bug report

When the Scheduler is grouped, selecting a cell from the last row does not mark it as selected in IE 11 in TimelineView.

Reproduction of the problem

You will notice that the same cell in the previous row is marked as selected.

Current behavior

Selection does not mark the correct cell as selected in TimeLine View with grouping.

Expected/desired behavior

Selection should mark the correct cell as selected in TimeLine View with grouping.

Environment

  • Kendo UI version: 2019.2.516
  • Browser: [all]
Unplanned
Last Updated: 28 Jun 2019 08:16 by ADMIN

Hi, 

I'm looking to be able to modify agenda view, so that it is like the group headers in grid - having the date as the group header and then the events that occur on that date shown underneath (also collapsible). Is this possible?

I also tried to do this in the grid but it doesn't seem to work due to the fact that it using a start and an end, not a single date column.

Thanks

 

 

Unplanned
Last Updated: 21 Jun 2021 10:08 by ADMIN

Dear Telerik,

My problem is behind the "timelineMonth" view of the Scheduler. In the documentation it is written that "showWorkHours" has a support only behind "day" and "week" views. But it is not really like that. In fact, it is included also in "timeline" and "timelineWeek" views and it works fine. Even more, this feature works also in "timelineMonth", but with a small exception that I want to focus on your attention. 

Here is an example showing the problem. It's only about selecting the "today" (in my example the "date" property is showing "today". The same behavior could be achieved if you change it to another date and click the "today" button).

I can show you another particular example describing why this feature is very useful. Here, if the user press on "show business hours" button and then select the "Timeline Month", he will break the logic behind. And it makes somehow the "Show Business Hours" button problematic. And let say I should make some workaround to avoid this thing happens, but not sure why.

Hope this is valuable.

Best Regards, Boyan.

Completed
Last Updated: 25 Jan 2021 09:57 by ADMIN
Release 2021.R1.SP.next
Created by: Brightstar
Comments: 3
Category: Scheduler
Type: Bug Report
3

According to the documentation for Scheduler.select() this method should "Gets or sets the events (or slots) which are selected." But if I pass in an array of multiple uid elements it only selects the last item in the array.

Code

jsbin example: https://jsbin.com/nirisakavo/1/edit?html,js,output

Really just added a function to select all:

function SelectAll() {
  var scheduler = $("#scheduler").data("kendoScheduler");
  var allEvents = scheduler.data().map(function(val, i) { return val.uid; });
  scheduler.select(allEvents);
}

Repro

Click the 'Select All' button.

Expected: Selects all events.

Actual: Selects only last event.

 

Completed
Last Updated: 03 Jun 2019 13:50 by ADMIN
Release 2019.R2.SP.Next
Created by: Konstantin
Comments: 0
Category: Scheduler
Type: Bug Report
0

Bug report

The create button should be available only when editable is enabled.

Reproduction of the problem

https://dojo.telerik.com/itUCAdeK

Workaround

https://dojo.telerik.com/IMAWIZeV

Declined
Last Updated: 05 Jun 2019 08:58 by ADMIN

Dear Telerik team.

Currently you use hard coded formats to display dates and times.

majorTimeHeaderTemplate: '<span class=\'k-time-text\'>#=kendo.toString(date, \'h:mm\')#</span> ' + '<span class=\'k-time-period\'>#=kendo.toString(date, \'tt\')#</span>'

It would be nice if you would respect the culture settings and at least I would not have to change the templates every time I use a scheduler.

I didn't check all your widgets, but I guess the scheduler is not the only one ignoring the culture settings.

Please make use of the current culture settings/patterns

Thanks in advance

Bernd

Unplanned
Last Updated: 15 Apr 2019 15:01 by ADMIN
Created by: Brodie
Comments: 1
Category: Scheduler
Type: Feature Request
0

Hi there,

 

I would like to know if there is a way to add aggregates to a kendo scheduler?

 

There is a particular value that I'd like to apply an aggregate.sum to, then have that sum appear in a header. Is this possible with the scheduler? or is there some work around?

 

Thank you,

 

Brodie

Declined
Last Updated: 21 Jun 2021 09:58 by ADMIN
Created by: Howard
Comments: 1
Category: Scheduler
Type: Feature Request
0
Prevent the page from scrolling the Scheduler into view if the widget is focused through keyboard navigation or selection.
Unplanned
Last Updated: 07 Jan 2019 12:39 by ADMIN

Dear Support Team,

Please try the following scenario. Create a weekly recurring event for the 4rth of April that has no end. 
Go at the next week (9/4 - 13/4) and move the event (11/4) 1 hour forward. At the confirmation popup please select 'Edit the series'.
Go back to the previous week (2/4 - 6/4). The event of 4/4 has disappeared!!

The specific dates are used as an example. Feel free to use any date your want.

Thank you in advance,
Thomas.