The new calendar components is great, but it's missing a significant functionality, which has been available for a long time with the jquery calendar and users love. There are no arrows for navigating the calendar. The arrow buttons are much easier than keyboard page-up/page-down and the navigation bar. I realize there is very little space next to the Today button, but many users really need it.
As it's a calendar, I would like to select more dates (not ranges). If I can not select several dates as I would in a normal calendar, I assume this is only a DatePicker and not a Calendar.
Please provide an opportunity to show a full week available on the Calendar component, even if the end of the week falls on the following month, e.g.:
Same goes for days from previous month, falling in the start week of the current month.
Thank you in advance.
It would be nice if Calendar Component can support same multiple selection functionality as Telerik MVC Calendar.
That includes:
Currently, for some reason - the buttons only exist around the "Today" button in the classic type Calendar.
It doesn't pass our UX requirements and actually looks odd - the buttons change month/year yet are around a value that never changes, on the side.
Can we get a template option or a built-in way to have these buttons around the title, like in Kendo jQuery classic Calendar?
The current headerTitleTemplate only allows changing the contents of that title button - and you can't put buttons inside buttons.
Hello Progress Software Corporation,
We currently have an issue with the Date Input (Calendar) KendoUI Angular component. We need to use the selection mode "multiple" when selecting a full week. When the component loads, it's possible to select a full week with no issue but once you start to play around with the infinite scroll, then another week is selected instead of the desired one. The bug can be reproduced directly in the example provided in your documentation.
https://www.telerik.com/kendo-angular-ui/components/dateinputs/calendar/multiple-selection/
For example,
Repeat this process for more than 4 months and you will see the bug where the selection of the full week jumps to a completely different month.
Kind regards,
Rodrigo Rosenblüth