Planned
Last Updated: 25 Jun 2025 03:22 by ADMIN
Scheduled for 2025 Q3 (Aug)
Created by: Emma
Comments: 3
Category: Scheduler
Type: Bug Report
0

I have been having issues adding the month view to a Telerik Blazor scheduler component, when there is grouping. It gives a null reference error any time I try to switch to the month view. I also tried it using the available demo for grouping in Telerik REPL, the only difference I found between my code and the demo was that I had used the ItemsPerSlot parameter.  I added this to the demo, and was able to reproduce the error I was seeing, and I have attached the console output from the REPL demo. I believe there is either a bug with the ItemsPerSlot being used in conjunction with grouping on a scheduler component, or some instruction missing from how to set it up properly to prevent this null reference issue. 

Changed code:

<SchedulerMonthView ItemsPerSlot="5"></SchedulerMonthView>

Demo used:

Blazor Scheduler (Event Calendar) Demos - Grouping | Telerik UI for Blazor