Completed
Last Updated: 14 Oct 2021 13:22 by ADMIN
Release R3 2021 SP
Make it possible for the Timeruler of the control to be set to Auto size which would cause the control to fill the entire space in a specific container.
Unplanned
Last Updated: 30 Aug 2023 09:26 by Ludwig
ADMIN
Created by: Telerik Admin
Comments: 1
Category: GanttView
Type: Feature Request
18
Allow creating of recurring tasks
Unplanned
Last Updated: 30 Aug 2021 11:05 by ADMIN
ADMIN
Created by: Telerik Admin
Comments: 2
Category: GanttView
Type: Feature Request
14
In the RadGanttView implament filter functionality similar to RadGridView.
Unplanned
Last Updated: 03 Jan 2017 20:39 by ADMIN
ADMIN
Created by: Polya
Comments: 0
Category: GanttView
Type: Feature Request
14

			
Completed
Last Updated: 01 Aug 2016 07:43 by ADMIN
Created by: Nelson
Comments: 2
Category: GanttView
Type: Feature Request
12
Not for Silverlight, I need it for WPF projects.
Please change it.
Unplanned
Last Updated: 03 Jan 2017 20:38 by Marius
Make it possible when exporting the content of the control to be able to set its Width to fit one page's Width.
Duplicated
Last Updated: 09 Mar 2023 17:05 by ADMIN
ADMIN
Created by: Ventzi
Comments: 0
Category: GanttView
Type: Feature Request
10

			
Unplanned
Last Updated: 03 Apr 2019 13:36 by ADMIN
It would be useful if the control takes advantage of the RadSpreadProcessing, RadPdfProcessing and RadWordsProcessing. This will allow developers to easily export the control's contents to the desired format. Currently it is possible to export the control's content as images. 

More details about the available RadGanttView exporting could be found here: 
- For WPF - http://docs.telerik.com/devtools/wpf/controls/radganttview/features/exportingsupport
- For Silverlight - http://docs.telerik.com/devtools/silverlight/controls/radganttview/features/exportingsupport
Unplanned
Last Updated: 03 Jan 2017 21:15 by ADMIN
Make it possible to use a CollectionViewSource and its Filter etc. built-in features with the RadGanttView control's TasksSource.
Unplanned
Last Updated: 13 Sep 2016 12:43 by ADMIN
ADMIN
Created by: Telerik Admin
Comments: 0
Category: GanttView
Type: Feature Request
8
This property describes how exactly a cell in the Grid to go to edit mode. Its could be a Click, DoubleClick, Enter, F2 etc.

This item is related to http://www.telerik.com/support/pits.aspx#/details/Issue=11831.
Unplanned
Last Updated: 03 Jan 2017 20:45 by ADMIN
ADMIN
Created by: Polya
Comments: 0
Category: GanttView
Type: Feature Request
8

			
Unplanned
Last Updated: 03 Jan 2017 21:03 by ADMIN
ADMIN
Created by: Telerik Admin
Comments: 0
Category: GanttView
Type: Feature Request
7
As a <role> I want <ability> so that <benefit>.
Unplanned
Last Updated: 12 Feb 2019 12:03 by ADMIN
Created by: William
Comments: 0
Category: GanttView
Type: Feature Request
6

Hi,

I have recently been trying to implement a "split tasks" feature you would find in common Gantt packages, but Telerik doesn't support this out of the box. It would be great if this was supported, as modifying it ourselves comes with some level of risk, and may also be affected when we upgrade between versions.

Thanks.

Unplanned
Last Updated: 03 Jan 2017 21:04 by ADMIN
Add a mechanism to determine the position of the main resizer and one for setting it. This will allow the users of the control to persist its position and reload it later.
Unplanned
Last Updated: 13 Sep 2016 12:45 by ADMIN
ADMIN
Created by: Telerik Admin
Comments: 0
Category: GanttView
Type: Feature Request
5
The user should be able to create and add footer rows in RadGanttView in order to be able to summaries the data of the column above.
Unplanned
Last Updated: 03 Jan 2017 20:39 by ADMIN
The RadGanttView should provide a way to style the dependencies between the highlighted tasks. When the highlighted tasks are provided via HighlightedItemsSource property its would be nice if the relations could be styled  too.
Unplanned
Last Updated: 21 Aug 2023 07:11 by ADMIN

I have combined these two requests in a single ticket as I feel that they are closely linked, and the second does not make much sense without the first.


Stretch option for Gantt task visualisation

It would be very useful if the user could specify a 'stretch' option for the horizontal width of the Gantt which causes the task visualisation to fill all of the available space (by increasing the PixelLength). The Gantt chart looks very strange when a fixed PixelLength results in a large amount of empty space, particularly as most other containers can be resized. It can also be difficult to guarantee that the Gantt chart fills all available space when it is inside a resizable component.

 

Ability to move resize control when both sides are at their 'desired width'

Currently, the resize control which separates the column data on the left from the visualisation of the gantt tasks on the right cannot be moved when both sides have reached their 'desired width'. However, this is not intuitive as other types of Telerik controls (notably the GridView) allow the width of components to be increased or decreased by clicking and dragging left/right, even if an absolute width has been set in the XAML.

Anticipated behaviour:

  • When dragging to the right, it seems logical to start expanding the width of the text columns on the left.
  • When dragging to the left, if the Gantt visualisation is already at its desired width, the PixelLength should be increased so that the Gantt fills all the available space.
  • When dragging to the left the columns with Width set to auto size should resize accordingly to the new available size. Currently, they stay in their initial desired size and a horizontal scrollbar appears when you resize to the left.

 

I recognise that these features may not be desirable for all users, so it would be helpful if these were features that could be toggled on/off.

 


 

Unplanned
Last Updated: 03 Jan 2017 20:43 by ADMIN
ADMIN
Created by: Telerik Admin
Comments: 0
Category: GanttView
Type: Feature Request
4

			
Unplanned
Last Updated: 03 Jan 2017 20:48 by ADMIN
Allow the users of the control to specify different types of calendars for the tasks, the resources and the timeline of the GanttView like in MSProject.
Unplanned
Last Updated: 03 Jan 2017 21:03 by ADMIN
As a user of the control I want to be able to highlight grid and timeline rows in different colors, depending on the data inside the task so that the user can easily see tasks with special properties.
1 2 3