Approved
Last Updated: 23 Sep 2019 11:18 by ADMIN
Add an API that allows you to customize the look and the behavior of the visual element displayed over the event container while drag-resizing it.
Approved
Last Updated: 02 Sep 2019 11:24 by ADMIN

I have combined these two requests in a single ticket as I feel that they are closely linked, and the second does not make much sense without the first.


Stretch option for Gantt task visualisation

It would be very useful if the user could specify a 'stretch' option for the horizontal width of the Gantt which causes the task visualisation to fill all of the available space (by increasing the PixelLength). The Gantt chart looks very strange when a fixed PixelLength results in a large amount of empty space, particularly as most other containers can be resized. It can also be difficult to guarantee that the Gantt chart fills all available space when it is inside a resizable component.

 

Ability to move resize control when both sides are at their 'desired width'

Currently, the resize control which separates the column data on the left from the visualisation of the gantt tasks on the right cannot be moved when both sides have reached their 'desired width'. However, this is not intuitive as other types of Telerik controls (notably the GridView) allow the width of components to be increased or decreased by clicking and dragging left/right, even if an absolute width has been set in the XAML.

Anticipated behaviour:

  • When dragging to the right, it seems logical to start expanding the width of the text columns on the left.
  • When dragging to the left, if the Gantt visualisation is already at its desired width, the PixelLength should be increased so that the Gantt fills all the available space.

 

I recognise that these features may not be desirable for all users, so it would be helpful if these were features that could be toggled on/off.

 


 

Approved
Last Updated: 03 Apr 2019 13:36 by ADMIN
It would be useful if the control takes advantage of the RadSpreadProcessing, RadPdfProcessing and RadWordsProcessing. This will allow developers to easily export the control's contents to the desired format. Currently it is possible to export the control's content as images. 

More details about the available RadGanttView exporting could be found here: 
- For WPF - http://docs.telerik.com/devtools/wpf/controls/radganttview/features/exportingsupport
- For Silverlight - http://docs.telerik.com/devtools/silverlight/controls/radganttview/features/exportingsupport
Approved
Last Updated: 12 Feb 2019 12:03 by ADMIN
Created by: William
Comments: 0
Category: GanttView
Type: Feature Request
5

Hi,

I have recently been trying to implement a "split tasks" feature you would find in common Gantt packages, but Telerik doesn't support this out of the box. It would be great if this was supported, as modifying it ourselves comes with some level of risk, and may also be affected when we upgrade between versions.

Thanks.

Approved
Last Updated: 12 Sep 2018 13:01 by ADMIN
Approved
Last Updated: 11 Sep 2018 13:45 by ADMIN
The height of the GroupTickContainter, MajorTickContainter, MonorTickContainter cannot be changed at present.
Approved
Last Updated: 11 Jul 2018 13:31 by ADMIN
Look the attach file,when resize the GanttView  column (left or right) reciprocation,the colum resize line is not align to the grid column line.
just when the DPI is exceed 100%, Appears.
Approved
Last Updated: 13 Apr 2018 07:49 by ADMIN
Approved
Last Updated: 19 Mar 2018 14:21 by Vladimir
ADMIN
Created by: Vladimir Stoyanov
Comments: 0
Category: GanttView
Type: Bug Report
1

			
Approved
Last Updated: 16 Feb 2018 13:43 by ADMIN
The selection shown in the exported image is wrong in some cases. This is reproducible when you select multiple items (more than 2).

To work this around you can clear the selection before the export and then re-select the items. To do this you can use the SelectedItems collection of the RadGanttView control.
Approved
Last Updated: 21 Nov 2017 11:56 by ADMIN
Add the possibility of TimeRuler's TickIntervals to respect the CurrentUICulture's time format.
Approved
Last Updated: 04 Jan 2017 07:23 by ADMIN
Approved
Last Updated: 03 Jan 2017 21:18 by ADMIN
The scrollbars in RadGanttView are always visible for timeline part. They should be collapsed when the content of the timeline fits on the screen.
Approved
Last Updated: 03 Jan 2017 21:18 by ADMIN
ADMIN
Created by: Telerik Admin
Comments: 0
Category: GanttView
Type: Feature Request
13
Allow creating of recurring tasks
Approved
Last Updated: 03 Jan 2017 21:15 by ADMIN
Make it possible to use a CollectionViewSource and its Filter etc. built-in features with the RadGanttView control's TasksSource.
Approved
Last Updated: 03 Jan 2017 21:15 by ADMIN
Make it possible for the Timeruler of the control to be set to Auto size which would cause the control to fill the entire space in a specific container.
Approved
Last Updated: 03 Jan 2017 21:04 by ADMIN
Add a mechanism to determine the position of the main resizer and one for setting it. This will allow the users of the control to persist its position and reload it later.
Approved
Last Updated: 03 Jan 2017 21:03 by ADMIN
As a user of the control I want to be able to highlight grid and timeline rows in different colors, depending on the data inside the task so that the user can easily see tasks with special properties.
Approved
Last Updated: 03 Jan 2017 21:03 by ADMIN
ADMIN
Created by: Telerik Admin
Comments: 0
Category: GanttView
Type: Feature Request
7
As a <role> I want <ability> so that <benefit>.
1 2 3