Unplanned
Last Updated: 20 Jan 2016 12:27 by Don
ADMIN
Boyan Boev
Created on: 07 Dec 2015 11:26
Type: Bug Report
2
Switching between tests removes the old performance results from the History tab
Steps to reproduce and video of the issue are in the internal description.
3 comments
Don
Posted on: 20 Jan 2016 12:27
This means I have to wait until all the performance results for the test are loaded, and only after that I will be able to safely perform the new test run.

This workaround takes a lot of time, since there can be a lot of test results and all of them are needed to be loaded. It'll be better if I should not keep in mind that one wrong move can erase all of my previous work.
ADMIN
Daniel Djambov
Posted on: 18 Jan 2016 07:25
Telerik: the issue is in our queue, it is considered specific and affects only cases when switching between tests then running Performance test. The workaround is simple - when you want to run a Performance test, open the test, go to Performance view and run it, when finished close the test and if you want to run another performance test, do the above steps again.
Don
Posted on: 15 Jan 2016 13:27
Any predictions when this will be fixed?