The test environment: * Master test suite is at about 240 tests and growing. * This is currently divided into 9 test lists of varying sizes. * The execution lab currently is 4 physical desktop machines. I schedule the test lists to run across these 4 machines. When I want to see the results of the test lists, I may be able to look at one or two test list results. But, it appears the application holds all these results in memory. Therefore, as I move through and look the results of each list I encounter out of memory exception and Test Studio crashes. Sometimes gracefully (with the prompt to save work) and sometimes it just disappears. The workaround is to leave the test results tab after viewing one or two lists. However this further slows down and disrupts the process of reviewing the results.