Under Review
Last Updated: 23 Apr 2019 10:44 by ADMIN
Created by: Paul
Comments: 9
Category: Scheduler
Type: Feature Request
27
It would be very useful from a visual and functional perspective to be able to view scheduler items in a year view, that seems to be currently unsupported.
Under Review
Last Updated: 24 Sep 2018 08:28 by ADMIN
Created by: Amitesh
Comments: 2
Category: Scheduler
Type: Feature Request
13
There should be the ability to show resources (this is multiple resources) without grouping. All resources will show in a line. This would have worked in our case where we have employees and sub-contractors as two different set of resources but cannot be grouped. We needed to show both the sets on the scheduler at the same time and also assign events across to both sets (so an event can belong to an employee and sub-contractor). The two sets cannot be combined into one resources collection as the resources can have the same Ids
Under Review
Last Updated: 31 Jan 2018 14:00 by ADMIN
Created by: Shawn
Comments: 4
Category: Scheduler
Type: Feature Request
6
At the moment the Scheduler allows multiple appointment selection with Ctrl key held down. I would like to be able to choose between Single or Multiple selection mode, just like a Combobox. I believe there are real and valid use cases to restrict users to 1 selection at a time.
Under Review
Last Updated: 25 May 2016 20:19 by ADMIN
Created by: Steve
Comments: 1
Category: Scheduler
Type: Feature Request
0
I would like to define a template or a message or something such that when there's no events the scheduler doesn't just look like a smushed collection of buttons, or having to set a min-height on the event zone or some other hack.
Under Review
Last Updated: 11 May 2016 06:32 by ADMIN
Created by: icebits
Comments: 2
Category: Scheduler
Type: Feature Request
15
I got 2 "views" sharing same page, Scheduler is on the second/hidden view and only show/trigger when user select to view it. Therefore, I need Autobind to be false (same feature as exists on other controls like Gridview), to prevent Scheduler auto populate at the initial stage. Second, I need to parse additional parameter during read/fetch data from Scheduler. Thanks.