Need More Info
Last Updated: 23 Jan 2020 08:13 by ADMIN
Created by: Luis Ismael
Comments: 1
Category: Scheduler
Type: Feature Request
1

It would be great if it could be blocked

example in the image

Scheduler

Need More Info
Last Updated: 22 Jan 2020 09:11 by ADMIN
Created by: Igor
Comments: 1
Category: Scheduler
Type: Feature Request
1
Add the ability to use html tags in Scheduler resource
Approved
Last Updated: 20 Jan 2020 12:38 by ADMIN
Created by: Matthias
Comments: 7
Category: Scheduler
Type: Feature Request
54
Allow to have different child groups for each parent group

Example:
 ___________________________________
 Meeting Room 101     |   Meeting Room 201
 ___________________________________
 Alex  |  Bob                 |   Charlie
 ___________________________________
Approved
Last Updated: 20 Jan 2020 12:06 by ADMIN
Created by: Massimiliano
Comments: 3
Category: Scheduler
Type: Feature Request
47
Kendo Scheduler should have iCalendar Export (in similar way to ASP.NET Ajax Scheduler).
Completed
Last Updated: 13 Jan 2020 09:19 by ADMIN
Release R1 2020

Bug report

In Scheduler event, if the eventTemplate has a table, the add event is triggered when editing an existing task, resulting that both popups open and close instantly.

Reproduction of the problem

Open this dojo example. Choose an event and click the span containing the text "I have some icons here".

Current behavior

The add event popup shows together with the edit event popup.

Expected/desired behavior

Only the edit event popup should be displayed.

Environment

  • Kendo UI version: 2019.3.917
  • Browser: [all]
Completed
Last Updated: 13 Jan 2020 09:16 by ADMIN
Release R1 2020
Created by: Narendra
Comments: 3
Category: Scheduler
Type: Bug Report
0

hello,

 

we recently upgraded the kendo from 2018 r1 to latest release. looks like there is a bug in the scheduler. With the server filtering and server operation true, I am unable to add Event(before upgrade it's fine).

check the dojo https://dojo.telerik.com/EhaXemiz 

 

can you please look into it.

 

Thanks,

Narendra

Approved
Last Updated: 08 Jan 2020 13:59 by ADMIN
Created by: Kenneth
Comments: 1
Category: Scheduler
Type: Bug Report
0

Hi, we're using scheduler and we have the selectable set to true so users can drag and select timeslots to create.

The issue we're having is related to the autoscrolling when the user attempts to create a selection that is longer than the display window and attempts to drag past the display window but the scheduler would not auto scroll to expand the selection.

However, if we were to expand an existing event, the handler would be able to expand past the display window and scheduler would auto scroll. We were wondering if the event creation could have the same behavior.

 

Thanks,

Kenneth 

Approved
Last Updated: 12 Dec 2019 17:18 by ADMIN
Created by: Fabien
Comments: 2
Category: Scheduler
Type: Feature Request
8
It would be great to be able to customize the scheduler's toolbar, either by specify custom buttons and actions through 'toolbar' option or by providing a custom template.
Approved
Last Updated: 29 Nov 2019 09:37 by ADMIN

In some cases, especially when grouping is involved, the day/week/workWeek views may end up with too many events in a single slot. If the total width of those events could not fit within the slot size, those events will overflow and cover some of their sibling events. To avoid such a result, events rendering in a scrollable container should be considered. This way each event will have a minimum width even if it has too many siblings in the same slot.

Here is a Dojo sample demonstrating the case: https://dojo.telerik.com/UnUnUTAW/6

Approved
Last Updated: 27 Nov 2019 12:52 by ADMIN

Scenario:

A user deletes an occurence because a few people are ill. Five minutes later the superior enters the office and says the meeting happens anyway. Or the user deletes a wrong occurence.

Resetting the recurrence might not be an option for long running meetings. Like weekly Scrum, project jour fix, ... where the other exceptions should persist. Currently the user has to create a new, separate event.

The exceptions could be rendered as multiselect or list in a separate window which opens after a button click. That way the recurrence editor would not look messy with lots of exceptions.

Pending Review
Last Updated: 11 Nov 2019 12:13 by Simon
For the Kendo Scheduler Recurrence Rule editor, it would be nice to have the possibility to select multiple options for the recurrence of monthly events. For example instead of only being able to select only the first Monday of the Month for a recurring event to be able to select every first and third Monday of the Month for a recurring event.
Approved
Last Updated: 08 Nov 2019 08:38 by ADMIN
Currently, the method that selects the events after DataSource.read() depends on the events' uids. However, upon data binding, new event elements are created, with different uids. Therefore the corresponding event is not selected.
Completed
Last Updated: 10 Oct 2019 14:42 by ADMIN
Release 2019.R3.SP.next
Created by: Chinmaya
Comments: 0
Category: Scheduler
Type: Bug Report
0

Bug report

Scheduler cannot be scrolled in iOS 13 with Chrome

Reproduction of the problem

The issue can be reproduces in the Demos with the Chrome browser.

Current behavior

Scheduler content area cannot be scrolled.

Expected/desired behavior

Scheduler content area should be scrollable.

Environment

  • Kendo UI version: 2019.3.917
  • Browser: [all]
Approved
Last Updated: 01 Oct 2019 07:29 by ADMIN
Created by: Hitendra
Comments: 1
Category: Scheduler
Type: Feature Request
2

Hi Team,

 

It would be nice to have a feature of Collapsible / Expandable grouping function like tree view in Kendo Scheduler Timeline view. We have multiple head groups with 100 sub groups which we are not currently able to Expand / Collapse.

 

Sample Expand / Collpase feature like https://demos.telerik.com/kendo-ui/treeview/checkboxes

File attached for reference.

 

Thank you.

 

 

 

Approved
Last Updated: 15 Aug 2019 08:13 by ADMIN
Currently events >24h are automatically shown in the all day area. This is confusing if the event starts or ends somewhere during the day. E.g. it starts at 5 p.m. on tuesday and ends on 11 a.m. on thursday.

Noone knows when the resource is really available if the event is shown as all day from tuesday to thursday.

There should be an option to turn that behaviour off and show such events as regular events.

Maybe the only thing needing change is this line in _renderEvents:
var isMultiDayEvent = event.isAllDay || event.end.getTime() - event.start.getTime() >= MS_PER_DAY;
Approved
Last Updated: 12 Aug 2019 14:14 by ADMIN

Bug report

Reproduction of the problem

Reproducible in the Events demo.

  1. In the AllDay slot click and drag the mouse from Monday to Wednesday.
  2. The change event fires 3 times (expected).
  3. Click on Wednesday to select only that slot.
  4. The change event does not fire.

Also reproducible when selecting the slots from right to left (Wed to Mon) and then selecting the last slot (Mon).

The behavior is identical when selecting slots in a specific day, e.g. selecting and dragging from 8:00 to 10:00 and then selecting the last slot (9:30-10:00).

Current behavior

The change event does not fire.

Expected/desired behavior

The change event fires.

Environment

  • Kendo UI version: 2019.2.619
  • jQuery version: x.y
  • Browser: [all ]
Approved
Last Updated: 31 Jul 2019 17:35 by ADMIN
Created by: Max
Comments: 0
Category: Scheduler
Type: Feature Request
39
In horizontal configuration, with resources displayed down the left side of the control, a large number of resources will cause the control to stop functioning.  In some cases, like ours, we do not have the option to filter the resources by those that have scheduled events, and so infinite scrolling is necessary for the number of resources we need to support. For reference, see the forum post about this here: http://www.telerik.com/forums/virtual-scrolling-for-scheduler-with-many-resources
Completed
Last Updated: 26 Jul 2019 14:17 by ADMIN
The user should be able to select multiple events at the same time by pressing the control key. At the moment this can not be done.
The following example shows the issue: http://dojo.telerik.com/udItE -> It is not possible to select events from Meeting Room 101 and Meeting Room 201 at the same time.

This feature would make it possible to swap events from different groups. For example, swap the meeting rooms of two events.
Completed
Last Updated: 26 Jul 2019 14:08 by ADMIN
Created by: Imported User
Comments: 1
Category: Scheduler
Type: Feature Request
1
Please add the feature to open an event from the weekview.
Approved
Last Updated: 28 Jun 2019 08:37 by ADMIN

Bug report

When the Scheduler is grouped, selecting a cell from the last row does not mark it as selected in IE 11 in TimelineView.

Reproduction of the problem

You will notice that the same cell in the previous row is marked as selected.

Current behavior

Selection does not mark the correct cell as selected in TimeLine View with grouping.

Expected/desired behavior

Selection should mark the correct cell as selected in TimeLine View with grouping.

Environment

  • Kendo UI version: 2019.2.516
  • Browser: [all]
1 2 3 4 5 6