Under Review
Last Updated: 15 Feb 2019 11:44 by Allan
Created by: Paul
Comments: 8
Category: Scheduler
Type: Feature Request
25
It would be very useful from a visual and functional perspective to be able to view scheduler items in a year view, that seems to be currently unsupported.
New
Last Updated: 09 Jan 2019 13:24 by Richard
Currently events >24h are automatically shown in the all day area. This is confusing if the event starts or ends somewhere during the day. E.g. it starts at 5 p.m. on tuesday and ends on 11 a.m. on thursday.

Noone knows when the resource is really available if the event is shown as all day from tuesday to thursday.

There should be an option to turn that behaviour off and show such events as regular events.

Maybe the only thing needing change is this line in _renderEvents:
var isMultiDayEvent = event.isAllDay || event.end.getTime() - event.start.getTime() >= MS_PER_DAY;
Approved
Last Updated: 07 Jan 2019 12:39 by ADMIN

Dear Support Team,

Please try the following scenario. Create a weekly recurring event for the 4rth of April that has no end. 
Go at the next week (9/4 - 13/4) and move the event (11/4) 1 hour forward. At the confirmation popup please select 'Edit the series'.
Go back to the previous week (2/4 - 6/4). The event of 4/4 has disappeared!!

The specific dates are used as an example. Feel free to use any date your want.

Thank you in advance,
Thomas.

New
Last Updated: 04 Dec 2018 14:06 by Luis Ismael
Created by: Luis Ismael
Comments: 0
Category: Scheduler
Type: Feature Request
1

It would be great if it could be blocked

example in the image

Scheduler

New
Last Updated: 25 Oct 2018 05:07 by ADMIN
Created by: Matthias
Comments: 7
Category: Scheduler
Type: Feature Request
44
Allow to have different child groups for each parent group

Example:
 ___________________________________
 Meeting Room 101     |   Meeting Room 201
 ___________________________________
 Alex  |  Bob                 |   Charlie
 ___________________________________
New
Last Updated: 10 Oct 2018 08:27 by ADMIN
Created by: Max
Comments: 0
Category: Scheduler
Type: Feature Request
33
In horizontal configuration, with resources displayed down the left side of the control, a large number of resources will cause the control to stop functioning.  In some cases, like ours, we do not have the option to filter the resources by those that have scheduled events, and so infinite scrolling is necessary for the number of resources we need to support. For reference, see the forum post about this here: http://www.telerik.com/forums/virtual-scrolling-for-scheduler-with-many-resources
New
Last Updated: 27 Sep 2018 15:51 by ADMIN
Created by: Massimiliano
Comments: 3
Category: Scheduler
Type: Feature Request
45
Kendo Scheduler should have iCalendar Export (in similar way to ASP.NET Ajax Scheduler).
New
Last Updated: 27 Sep 2018 05:19 by ADMIN
Created by: Imported User
Comments: 0
Category: Scheduler
Type: Feature Request
9
Being able to highlight a specific date in the Scheduler (not necessarily today) that will be visible regardless of the view the user is using.
New
Last Updated: 24 Sep 2018 13:40 by ADMIN
Created by: Fred
Comments: 0
Category: Scheduler
Type: Feature Request
2
The configuration should provide a flag for rendering small events to take up their actual size. The current default size of an event is the size of a slot, if the event's duration is smaller than the slot duration. It would be nice to be able to switch to a behavior where if an event is 5 min and the slot is 15 min, it will show up with the size of a third of the slot. This was possible in the Silverlight implementation, with the EnableSmallAppointmentsRendering flag set to false (for Silverlight that was the default behavior).
Under Review
Last Updated: 24 Sep 2018 08:28 by ADMIN
Created by: Amitesh
Comments: 2
Category: Scheduler
Type: Feature Request
12
There should be the ability to show resources (this is multiple resources) without grouping. All resources will show in a line. This would have worked in our case where we have employees and sub-contractors as two different set of resources but cannot be grouped. We needed to show both the sets on the scheduler at the same time and also assign events across to both sets (so an event can belong to an employee and sub-contractor). The two sets cannot be combined into one resources collection as the resources can have the same Ids
New
Last Updated: 24 Sep 2018 08:26 by ADMIN
is maybe planned? it would be great, as great is in the Silverlight one...
New
Last Updated: 20 Sep 2018 18:17 by ADMIN
Created by: Hitendra
Comments: 0
Category: Scheduler
Type: Feature Request
8
In a Kendo Scheduler it would be nice to view the grouped items like treeview which can expand and collapse the rows. We have the same expand/collapse function with Kendo Gantt control, need the same in Kendo Scheduler
New
Last Updated: 17 Sep 2018 11:45 by ADMIN
Currently you have to map every required property manually. Like this:

                model.Field("start", typeof(DateTime)).From("Start");
                model.Field("end", typeof(DateTime)).From("End");
                model.Field("title", typeof(string)).From("Title");
                model.Field("description", typeof(string)).From("Description");
                model.Field("recurrenceID", typeof(int)).From("RecurrenceID");
                model.Field("recurrenceRule", typeof(string)).From("RecurrenceRule");
                model.Field("recurrenceException", typeof(string)).From("RecurrenceException");
                model.Field("isAllDay", typeof(bool)).From("IsAllDay");
                model.Field("startTimezone", typeof(string)).From("StartTimezone");
model.Field("endTimezone", typeof(string)).From("EndTimezone");

It would be nice to be able to use the short form:

model.Field("Start");
...

The problem is not the "huge" amount of typing. What did cost me time was finding out that the SignalR version isn't working like the others.
New
Last Updated: 11 Sep 2018 05:59 by ADMIN
Created by: Imported User
Comments: 0
Category: Scheduler
Type: Feature Request
3
can we show Time vertically in Timeline view 
New
Last Updated: 29 Aug 2018 09:26 by Dan
Created by: Dan
Comments: 0
Category: Scheduler
Type: Feature Request
4
When adding appointment, give an option to add reminder and the time before appointment.
The scheduler will popup reminders on time.
New
Last Updated: 28 Aug 2018 16:02 by ADMIN
Now sorting array is hardcoded (for example in kendo.scheduler.timelineview.js) in render method:

[
    {
        field: 'start',
        dir: 'asc'
    },
    {
        field: 'end',
        dir: 'desc'
    }
]

it will be very good if you will implement this sorting inside scheduler cell (data/group field) as parameter.
New
Last Updated: 28 Aug 2018 12:24 by ADMIN
When there are more events than can be shown for a day (in the month view) on the Kendo UI Scheduler; clicking the expand button switches to 'Day View'. It would be useful to have an option to just expand the height of the day instead. This would match the behavior in the SilverLight version of the scheduler.
New
Last Updated: 10 Aug 2018 12:00 by ADMIN
Created by: Marc
Comments: 0
Category: Scheduler
Type: Feature Request
8
The RFC for iCal supports up to a recurrence at the second level.  While I think that is too much, you should be supporting recurrence at the minute level.

The Windows Task Scheduler supports this, as well as Linux/Unix Cron.

If you are using the Scheduler Widget as a UI for a job/task scheduling system, then having the ability to schedule at the minute level is important.

This is related to the feedback request to "Add hourly recurrence editor to Scheduler".
New
Last Updated: 03 Aug 2018 20:33 by ADMIN
Created by: Michael
Comments: 5
Category: Scheduler
Type: Feature Request
25
We have a need to be able to provide a dropdown above the scheduler, in order to allow the end user to change the time zone of the scheduler dynamically, even after it has been initialized.  Our team was disappointed that this is currently not possible (http://www.telerik.com/forums/timezone-dropdown), but maybe in the future.  Thanks for reading.
New
Last Updated: 19 Jul 2018 10:41 by ADMIN
Created by: Imported User
Comments: 0
Category: Scheduler
Type: Feature Request
5
The kendo scheduler allows you to generate templates, but the events will not stretch  dynamically to display the contents. If the event heights had additional height controls like filling a row from top to bottom instead of forcing white space below the events  it would give more real-estate inside the plugin without taking up more overall space on the screen.
1 2 3 4 5