Pending Review
Last Updated: 01 Jul 2018 16:17 by ADMIN
Created by: Imported User
Comments: 5
Category: Scheduler
Type: Feature Request
21
See http://alloyui.com/examples/scheduler/. This is very intuitive and kendoui fails here a bit. Even show the time in the event dynamically
Pending Review
Last Updated: 28 Aug 2018 16:02 by ADMIN
Now sorting array is hardcoded (for example in kendo.scheduler.timelineview.js) in render method:

[
    {
        field: 'start',
        dir: 'asc'
    },
    {
        field: 'end',
        dir: 'desc'
    }
]

it will be very good if you will implement this sorting inside scheduler cell (data/group field) as parameter.
Pending Review
Last Updated: 12 Oct 2017 12:10 by ADMIN
Currently, if you create a recurring event, then edit a single occurrence (make an exception), and then later edit the series, the exception will be lost.

Let's say you've booked a room from 10 - 12 every Tuesday for the next year, then edit a single occurrence maybe two months ahead, and then later need to perhaps correct a spelling error in  the series title. The edit you made to the single occurrence would then be lost, and that's not so easily spotted...

I would suggest letting the user decide whether or not to delete exceptions from the series when the series is edited.
Pending Review
Last Updated: 25 Sep 2017 17:19 by ADMIN
Created by: Shawn
Comments: 2
Category: Scheduler
Type: Feature Request
14
Some schedules require appointments that exceed midnight (for discussion's sake, a company that operates night shifts to accommodate customers on the other side of the world). In this case I would like the "Monday" column to start at Monday 6pm to Tuesday 7am.

This is instantly doable in WPF RadScheduleView by setting the property. I would expect this to be useful here as well, since there's an EndTime property it just needs to be expanded to display appointments correctly.
Pending Review
Last Updated: 09 Oct 2018 16:16 by ADMIN
Created by: Tom
Comments: 0
Category: Scheduler
Type: Feature Request
11
When using the Scheduler with multiple resources, the day, week and work week views become unresponsive as a result of the view loading all of the resources.

The following dojo demonstrates this http://dojo.telerik.com/EvEROL

It would be good if the Scheduler could be configured to allow virtual scrolling so that resources can be loaded at the point of scrolling down the view.

An example of why this might be required is:
- You have two lists of resources, one for projects and one for staff
- You would like to group the events by resource and see which member of staff they are assigned to and to which job they belong to.
- This would allow you to easily re-assign events to different members of staff or to different projects by dragging and dropping.
Pending Review
Last Updated: 26 Apr 2017 18:09 by ADMIN
Created by: Carlos
Comments: 4
Category: Scheduler
Type: Feature Request
10
Currently we can edit recurrences for intervals equal or greater than a day but we can't create or edit an hourly recurrence. 

For example: I want to create a 30 min long event which gets repeated from 8:00 AM to 12:00 AM, every working day.
Pending Review
Last Updated: 10 Aug 2018 12:00 by ADMIN
Created by: Marc
Comments: 0
Category: Scheduler
Type: Feature Request
9
The RFC for iCal supports up to a recurrence at the second level.  While I think that is too much, you should be supporting recurrence at the minute level.

The Windows Task Scheduler supports this, as well as Linux/Unix Cron.

If you are using the Scheduler Widget as a UI for a job/task scheduling system, then having the ability to schedule at the minute level is important.

This is related to the feedback request to "Add hourly recurrence editor to Scheduler".
Pending Review
Last Updated: 27 Sep 2018 05:19 by ADMIN
Created by: Imported User
Comments: 0
Category: Scheduler
Type: Feature Request
9
Being able to highlight a specific date in the Scheduler (not necessarily today) that will be visible regardless of the view the user is using.
Pending Review
Last Updated: 15 Mar 2018 12:57 by ADMIN
Created by: John
Comments: 7
Category: Scheduler
Type: Feature Request
8
When using the scheduler and you have a lot of all day events, the widget resizes to allow for all the all day events but then collapses the remaining day hours down to a scrollable view.  If you want the scheduler to fit on the screen without a browser scrollbar, the hours section is rendered virtually useless.
Pending Review
Last Updated: 24 Sep 2018 08:26 by ADMIN
is maybe planned? it would be great, as great is in the Silverlight one...
Pending Review
Last Updated: 26 May 2016 10:29 by ADMIN
For the moment the current time mark is only visible at the first column, for a better user experience the mark should be across the widget
Pending Review
Last Updated: 28 Aug 2018 12:24 by ADMIN
When there are more events than can be shown for a day (in the month view) on the Kendo UI Scheduler; clicking the expand button switches to 'Day View'. It would be useful to have an option to just expand the height of the day instead. This would match the behavior in the SilverLight version of the scheduler.
Pending Review
Last Updated: 11 May 2016 12:39 by ADMIN
Created by: Michael
Comments: 1
Category: Scheduler
Type: Feature Request
6
I would like to see built-in support for copying/pasting of events in the scheduler.  If multiple schedulers exist on the same page, it doesn't matter to me if you can copy/paste between them.  CTRL+C and CTRL+V as well as a context menu would be nice.
Pending Review
Last Updated: 28 Apr 2017 00:00 by ADMIN
Created by: jerome
Comments: 1
Category: Scheduler
Type: Feature Request
5
It will be fine to have a field "isReadOnly" on default scheduler datasource. This is to allow to share events like "public holidays", events of another users, ... or to prevent a user from changing an old event (according to business rules ...).
Pending Review
Last Updated: 02 Aug 2017 22:57 by ADMIN
When setting the color for a Scheduler event resource, allow for a CSS class instead of a simple color.
Pending Review
Last Updated: 19 Jul 2018 10:41 by ADMIN
Created by: Imported User
Comments: 0
Category: Scheduler
Type: Feature Request
5
The kendo scheduler allows you to generate templates, but the events will not stretch  dynamically to display the contents. If the event heights had additional height controls like filling a row from top to bottom instead of forcing white space below the events  it would give more real-estate inside the plugin without taking up more overall space on the screen.
Pending Review
Last Updated: 11 May 2016 07:12 by ADMIN
Hi,

I'm trying to define individual business hours for the scheduler. The  scheduler only uses a single start/end time for each work day. I want to define start/end times for each day specifically (ie. Monday has different times than Tuesday).
Eg:
Sunday working hours       @ 10:00 to 12:00
Monday working hours       @ 9:00 to 16:00
Tuesday working hours      @ 10:00 to 18:00
Wednesday working hours@ 06:00 to 12:00
Thursday working hours     @ 08:00 to 14:00
Friday working hours           @ 11:00 to 12:00
Saturday working hours      @ 11:30 to 13:00

Can anyone resolve my problem.

Thanks in advance
Pending Review
Last Updated: 11 Jan 2018 12:10 by ADMIN
Created by: Mario
Comments: 0
Category: Scheduler
Type: Feature Request
4
The scheduler in week-view and day-view is always starting at 12 am. We would like to request a simple function, which allows to let the calendar scroll to the desired hour! (Let's say it is 3PM and the user would see automatically see his appointments beyond 3PM, because that is what matters and not staring at 12AM )
Nobody want to look at a day view, which starts at 12am. There are in some forums suggestions mentioned how to potentially do it, but id does not work in all screen sizes without terribly breaking it! So please please add this small, but valuable feature...
Pending Review
Last Updated: 25 Aug 2016 13:37 by ADMIN
Created by: Walter
Comments: 0
Category: Scheduler
Type: Feature Request
4
We are looking into the scheduler but it seems to be missing a feature that we would really want in a scheduler.

If you are for example in the day view, you have left the timebar and right the events. It would be nice to zoom in on the times on the left.

instead of showing events from daystart - day end you would click on a chosen starttime drag to the endtime you wish and the scheduler would zoom in on items between the selected start- endtime.
1 2 3 4