Pending Review
Last Updated: 01 Jul 2016 11:11 by ADMIN
Created by: Martin
Comments: 0
Category: Gantt
Type: Feature Request
4
The current list of events associated with PDF creation of Gantt chart data is insufficient. In order to make this control production suitable the following PDF generation events/features would be needed:

1.- Ability to provide progress on the PDF file generation. Right now this can take minutes.

2.- Ability to cancel a PDF generation that is in progress. Right now this is not possible, but would be needed for lengthy operations.
Pending Review
Last Updated: 11 Aug 2016 16:31 by ADMIN
Created by: Janne
Comments: 1
Category: Gantt
Type: Feature Request
3
Add possibility to automatically center the Gantt timeline to a given date onload.
Pending Review
Last Updated: 09 Nov 2017 14:56 by ADMIN
Created by: Data Proget Developers
Comments: 0
Category: Gantt
Type: Feature Request
3
Is it possible to set custom holidays in gantt like Windows version ?
Pending Review
Last Updated: 27 Jul 2018 12:42 by ADMIN
Currently % complete calcs for summary tasks are based solely on the sum of % complete per child task / number of child tasks (x%+y%+z%)/3.   In this way, a small scale task of 1 or 2 days has a large impact on summary % complete whereas a large task of 60 days has a small impact.  Request is to add in weighting based on duration (end date - start date).
Approved
Last Updated: 05 Jun 2019 17:20 by ADMIN
Created by: ENEYDA
Comments: 1
Category: Gantt
Type: Feature Request
3

I am Working With Gantt in AngularJs, but I dont found way to make the Critical Path And Baseline in Gantt. 

is this possible?

 

https://dojo.telerik.com/UtUtiQER

Approved
Last Updated: 23 Jan 2020 07:11 by ADMIN
Created by: Ben
Comments: 3
Category: Gantt
Type: Feature Request
3
I would love to see a feature added to the MVC Gantt control that would allow filtering tasks within the Gantt. Currently when we filter tasks in our Gantt using an external filter which filters the datasource tasks are dropped from the result set if their parent tasks do not meet the filter criteria. This is obviously a problem and makes filtering useless when tasks are dropped when they actually meet the criteria. I would like to see the filtering work as the TreeView and TreeList controls do. When you filter a column in those controls the parent items are returned regardless of whether they meet the filter criteria. This is needed in a hierarchical control like the Gantt chart.

This would be a great addition to the control. In the meantime, we'll either leave filtering out of our application or try to find a way to recursively gather all of the parent task ids and include them in our service to return tasks that meet the filter criteria.

Thanks for considering!
Ben
Approved
Last Updated: 21 Nov 2019 23:54 by Ben
Created by: Vaishali
Comments: 2
Category: Gantt
Type: Feature Request
2

Implement support for external editor in the Gantt. Instead of using an editor template or calling the editTask method, make possible Gantt tasks to be updated without opening the default editor.

A modification in a child task, e.g. changing its start date, should also update the summary task.

Pending Review
Last Updated: 17 Oct 2019 08:34 by ADMIN
Created by: Sujeet
Comments: 1
Category: Gantt
Type: Feature Request
2

Hi,

I am using kendo's Gantt chart. But I unable to achieve few things using the existing Gantt chart features.
Following are the features I request should be provided for Gantt chart:

  1. Multiple tasks/milestones in a row.
  2. Multiple rows for a parent task.
  3. If space is not available in preceding row(s), overlapping tasks should be moved to next row.
  4. User should be able to provide start date for the quarter in a fiscal calendar. Ex: If user give 01st-June as the start date, then Q1 should start from 01st-June. Hence, quarters will be defined as: Q1(June-Aug), Q2(Sept-Nov), Q3(Dec-Feb), Q4(Mar-May)

Gantt chart requirement point 1-4

Refer above image for point 1-4

 

       5. If task label is exceeding the width of the task, then height of the task should be increased to accommodate task label(in other words, text should            be wrapped). Also, font-size of the text should be responsive, that is, font-size should be reduced to accommodate entire text in minimum task height.

Gantt chart Requirements point 5

Refer above image for point 5

 

Need More Info
Last Updated: 22 Jan 2020 15:54 by ADMIN
I'd like to modify the line of tasks summary in the Gantt chart. We'd like to display the sub-tasks in the parent task line. We would like to be able to display multiple tasks (children) in a single line (the parent task).
Approved
Last Updated: 29 May 2019 11:03 by ADMIN
To configure the component, I would like to be able to have and customize tooltips for the views when I am performing a resize or move on the tasks. I have looked through the documentation and all I could find one option called resizeTooltipFormat.

That is a problem for me because, first, it's only a format for the dates and not a full template, and second, there is no option to do the same for the move action.
Pending Review
Last Updated: 05 Oct 2017 13:42 by ADMIN
Created by: Imported User
Comments: 0
Category: Gantt
Type: Feature Request
2
Hour Span should be allowed integer values instead of only number values(currently it takes the floor of any decimal value)
Pending Review
Last Updated: 13 Nov 2017 21:20 by Daniel
Currently Task Template and Toolbar Template doesn't integrate with AngularJS. E.g. it is impossible to use {{ $ctrl.mymember }} or <my-angular-component></my-angular-component> for the task template in gantt.
Pending Review
Last Updated: 08 Mar 2018 07:20 by ADMIN
Created by: sarath
Comments: 0
Category: Gantt
Type: Feature Request
2
It would be great to have multiple column sort in Gantt view 
Pending Review
Last Updated: 22 Aug 2016 09:23 by Telerik Admin
Created by: Imported User
Comments: 0
Category: Gantt
Type: Feature Request
2
Pending Review
Last Updated: 24 Dec 2016 17:43 by ADMIN
Created by: Gal
Comments: 0
Category: Gantt
Type: Feature Request
2
Currently there is only template for Gantt
I need to be able to control the tooltip behaviour.

showOn:"mouseenter", "click" , "focus"
autoHide: true, false
position: "bottom", "top", "left", "right", "center"
Pending Review
Last Updated: 11 May 2016 07:23 by ADMIN
Created by: Randy
Comments: 1
Category: Gantt
Type: Feature Request
2
I'm interested in using the Gantt chart for a project scheduling application but I need a lot more customization on the look & feel than is currently available. For instance, being able to eliminate the secondary timescale bar under the primary so that if you're in, say, the month view there is no 'week' slots under it.
Pending Review
Last Updated: 11 May 2016 07:29 by ADMIN
From the 2015.2 release to the 2015.3 release, the built-in validation on the Start date was removed from the left-hand treelist.  So now I can move the Start date to be after the Finish date, and the Gantt control responds by treating this as a "move".   However, there is still built-in validation on the Finish date so that I cannot move the Finish date to before the start.   I would expect the same behavior for changes in both directions.   If I change the Finish date to before the Start date, then this should also be treated as a "move", where the duration of the task is retained, and the Start is also moved back N days.

This is a trivial change to make.  I think it's removing 1 line of code.  And this would really help with usability for users who want to achieve a "move" action, but who prefer to edit their data using the left-hand treelist instead of the right-hand timeline.
Pending Review
Last Updated: 11 May 2016 12:56 by ADMIN
Created by: Imported User
Comments: 0
Category: Gantt
Type: Feature Request
1
The Gantt widget has support for parent-child relationship, but the hierarchy only works, if the title property of a gantt task is used in column definitions. So if you have for example only an ID column in your column definition, you can not expand/shrink hierarchy.

Suggested improvement: make this option configurable via the columns declaration by adding "expandable: true/false" or make the hierarchy appear in the first column if the title property is not in the columns declaration.
Pending Review
Last Updated: 11 May 2016 13:32 by ADMIN
We have been looking into the possiblity of using Telerik Test Studio; however, the Gantt Chart control from Kendo is a key part of our application, and having a Translator to help with validating the control contents would be really helpful.