Pending Review
Last Updated: 08 Mar 2018 07:20 by ADMIN
Created by: sarath
Comments: 0
Category: Gantt
Type: Feature Request
2
It would be great to have multiple column sort in Gantt view 
Pending Review
Last Updated: 05 Oct 2017 13:42 by ADMIN
Created by: Imported User
Comments: 0
Category: Gantt
Type: Feature Request
2
Hour Span should be allowed integer values instead of only number values(currently it takes the floor of any decimal value)
Pending Review
Last Updated: 27 Jul 2018 12:42 by ADMIN
Currently % complete calcs for summary tasks are based solely on the sum of % complete per child task / number of child tasks (x%+y%+z%)/3.   In this way, a small scale task of 1 or 2 days has a large impact on summary % complete whereas a large task of 60 days has a small impact.  Request is to add in weighting based on duration (end date - start date).
Pending Review
Last Updated: 04 Aug 2017 20:38 by Scott
You can have thousands of lines (rows) of project data....you can't load the entire plan and scroll through it
Pending Review
Last Updated: 09 Nov 2017 14:56 by ADMIN
Created by: Data Proget Developers
Comments: 0
Category: Gantt
Type: Feature Request
3
Is it possible to set custom holidays in gantt like Windows version ?
Pending Review
Last Updated: 24 Dec 2016 17:43 by ADMIN
Created by: Gal
Comments: 0
Category: Gantt
Type: Feature Request
2
Currently there is only template for Gantt
I need to be able to control the tooltip behaviour.

showOn:"mouseenter", "click" , "focus"
autoHide: true, false
position: "bottom", "top", "left", "right", "center"
Pending Review
Last Updated: 05 Oct 2016 13:31 by Fabian
Right now the Gantt marks the current day with a line.

It would be great if we could pass an array of objects with title, type and begin/end information, which would be marked on the timeline background in a similar way -- for example display holidays or context time information (when planning something in a larger context).

Does not need to be editable -- being able to override the color for each object would be nice
Pending Review
Last Updated: 17 May 2017 12:08 by ADMIN
Created by: Imported User
Comments: 0
Category: Gantt
Type: Feature Request
5
Problem: We really want to fit Gantt's on particular paper sizes (def. landscape A3); however, using the paperSize option doesn't really work as the output (font size, row heights, etc.) end up being too big and not suitable.

And for the majority of the time, paperSize set to auto creates an output (font size mostly) too small.

Rock and a hard place... 

Solution 1: When pdf.paperSize is not set to auto i.e. A3, A4, etc. Allow a percentage scaling to be set, ideally individually, on X and Y.

Solution 2: Scale fonts and scale timeline on X axis maintaining taskList width.

Ultimately, get a large plan to fit on landscape A3.
Pending Review
Last Updated: 11 Aug 2016 16:31 by ADMIN
Created by: Janne
Comments: 1
Category: Gantt
Type: Feature Request
3
Add possibility to automatically center the Gantt timeline to a given date onload.
Pending Review
Last Updated: 11 May 2016 12:56 by ADMIN
Created by: Imported User
Comments: 0
Category: Gantt
Type: Feature Request
1
The Gantt widget has support for parent-child relationship, but the hierarchy only works, if the title property of a gantt task is used in column definitions. So if you have for example only an ID column in your column definition, you can not expand/shrink hierarchy.

Suggested improvement: make this option configurable via the columns declaration by adding "expandable: true/false" or make the hierarchy appear in the first column if the title property is not in the columns declaration.
Pending Review
Last Updated: 11 May 2016 07:29 by ADMIN
From the 2015.2 release to the 2015.3 release, the built-in validation on the Start date was removed from the left-hand treelist.  So now I can move the Start date to be after the Finish date, and the Gantt control responds by treating this as a "move".   However, there is still built-in validation on the Finish date so that I cannot move the Finish date to before the start.   I would expect the same behavior for changes in both directions.   If I change the Finish date to before the Start date, then this should also be treated as a "move", where the duration of the task is retained, and the Start is also moved back N days.

This is a trivial change to make.  I think it's removing 1 line of code.  And this would really help with usability for users who want to achieve a "move" action, but who prefer to edit their data using the left-hand treelist instead of the right-hand timeline.
Pending Review
Last Updated: 27 Jul 2018 13:17 by ADMIN
Created by: Andreas
Comments: 0
Category: Gantt
Type: Feature Request
6
In the Gantt control there should be events for expand/collapse to provide things like on-demand loading of subnodes for large project-trees
Pending Review
Last Updated: 11 May 2016 13:32 by ADMIN
We have been looking into the possiblity of using Telerik Test Studio; however, the Gantt Chart control from Kendo is a key part of our application, and having a Translator to help with validating the control contents would be really helpful.
Pending Review
Last Updated: 23 Aug 2018 16:44 by ADMIN
Created by: Imported User
Comments: 0
Category: Gantt
Type: Feature Request
12
We would like you add capability to Gantt chart control to handle time zones of the browsers. Currently, when Gantt chart control renders in browsers based in different time zones, it displays event start date/end date differently in each time zone no matter where the source code of the web application resides.
Pending Review
Last Updated: 01 Jul 2016 11:11 by ADMIN
Created by: Martin
Comments: 0
Category: Gantt
Type: Feature Request
4
The current list of events associated with PDF creation of Gantt chart data is insufficient. In order to make this control production suitable the following PDF generation events/features would be needed:

1.- Ability to provide progress on the PDF file generation. Right now this can take minutes.

2.- Ability to cancel a PDF generation that is in progress. Right now this is not possible, but would be needed for lengthy operations.
Pending Review
Last Updated: 11 May 2016 07:23 by ADMIN
Created by: Randy
Comments: 1
Category: Gantt
Type: Feature Request
2
I'm interested in using the Gantt chart for a project scheduling application but I need a lot more customization on the look & feel than is currently available. For instance, being able to eliminate the secondary timescale bar under the primary so that if you're in, say, the month view there is no 'week' slots under it.